• Company key performance> Business > Company key performance

    Date Business performance Remark
    2010. 05. 31 ~ 09. 30 Overhauled start water pumps and main feed pumps at Shinggori
    2010. 03. 20 ~ 04. 15 Overhauled fl uid couplings at Donghae Thermal Power Plant.
    2010. 02. 01 ~ 04. 14 Renovated BFP bush at Youngheung Thermal Power Plant.
    2010. 01. 01 ~ 02. 10 Renovated BFP casing cover at Hadong Thermal Power Plant.
    2009. 11. 01 ~ 11. 31 Overhauled BFP at Hadong Thermal Power Plant.
    2009. 10. 25 ~ 11. 05 Overhauled R2 at Dongsu Petrochemical.
    2009. 09. 29 ~ 10. 09 Overhauled BFP at Hanwha Combined Cycle Power Plant. 250*200SSD_7M
    2009. 09. 10 ~ 2010. 02. 25 Assembled BFP and 35 others for Mapna, Iran.
    2009. 09. 01 ~ 09. 30 Renovated BFP casing cover at Hadong Thermal Power Plant.
    2009. 09. 01 ~ 09. 30 Overhauled CWP at Samcheonpo Thermal Power Plant.
    2009. 07. 28 ~ 09. 04 Overhauled impeller of feed water pump at Seoincheon Power Plant No. 4.
    2009. 07. 06 ~ 10. 31 Overhauled start water pumps and main feed pumps at Shingori Nuclear Power Plant No. 1.
    2009. 06. 22 ~ 07. 31 Designed, manufactured, and supplied vertical pumps to Korea Institute of Industrial Technology.
    2009. 06. 01 ~ 10. 31 Developed and manufactured HPSI pump for Shingori Nuclear Power Plant No. 3 and 4.
    2009. 04. 01 ~ 05. 27 Overhauled Flowserve BFP.
       1 2 3 4 5