    2007. 06. 30 ~ 08. 20 Assembled API pumps for New FCC project. 150*100R2 Model
    2007. 06. 30 ~ 07. 20 Assembled BFP for Hanwha Chemical Corp. 150 SPD Model
    2007. 06. 25 ~ 06. 26 Overhauled BFP at OCI Company Ltd. MSS Model
    2007. 06. 20 ~ 06. 25 Manufactured hydraulic turbines for Hyosung Research Center. 5KW - 50KW
    2007. 06. 10 ~ 06. 20 Assembled BFPs for SKC and GS Caltex. 150 SPD 8M,4M
    2007. 05. 10 ~ 05. 20 Overhauled COP at Samcheonpo Thermal Power Plant. (Domestic products)
    2007. 04. 30 ~ 05. 09 Overhauled 10 IFWs at Samsung Total. (Domestic products)
    2007. 03. 12 ~ 05. 20 Localized CWP parts at Ulsan Thermal Power Plant. (KSB of Germany)
    2007. 03. 06 ~ 03. 15 Overhauled CWP at Hadong Thermal Power Plant. (Domestic products)
    2007. 02. 20 ~ 03. 30 Overhauled BFP at Daegu Combined Cycle Power Plant No. 2. SS Model
    2007. 02. 05 ~ 02. 25 Localized BFP parts and overhauled BFP at Shinincheon Thermal Power Plant. Repair(US made pump)
    2007. 01. 26 ~ 02. 04 Overhauled BFP at Jordan Rehab Power Plant. DSC Model
    2006. 11. 30 ~ 12. 20 Overhauled COP at Samcheonpo Thermal Power Plant. (Domestic products)
    2006. 10. 16 ~ 12. 18 Renovated SLP at Boryung Thermal Power Plant. 10 units (domestic products)
    2006. 09. 15 ~ 09. 23 Overhauled CWP at Hadong Thermal Power Plant. (Domestic products)